Morning Trading December 18, page-102

  1. 2,755 Posts.
    GGE -- waiting results -- Jesse-1A – Next Steps
    With preliminary swabbing complete, the Company will now isolate the lower, potentially water-wet
    Leadville zone with a cement and packer system, to facilitate a comprehensive helium gas flow
    test of the upper Leadville helium reservoir target with results expected prior to year end.
    RR1 waiting results - A total of 57 holes for 5,282m of RC drilling has been completed to date during Phase 2 drilling.
    ● The majority of all holes drilled across Phase 2, have reported multiple thick, stacked
    pegmatites1 within favourable metasedimentary and lesser mafic volcanic rock type
    Results from this part of the Phase 2 Drilling campaign are expected to be received in early
    2024, with all samples already sent to the laboratory for analysis
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.