MTM doing well GGE 20 December 2023 Jesse-1A Flows 1 Million...

  1. 2,769 Posts.
    MTM doing well
    GGE 20 December 2023

    Jesse-1A Flows 1 Million Cubic Feet of Gas Per Day
    • Significant Jesse-1A results demonstrate reservoir quality with
    measured helium concentrations trending up from 0.78%1 - consistent
    with the previously measured 1% helium from a downhole sample.
    • Jesse-1A to be sidetracked for casing, completion and focused
    stimulation ahead of production in early 2023.
    Grand Gulf Energy Ltd (ASX:GGE) (“Grand Gulf” or the “Company”) is pleased to
    advise that during comprehensive flow-testing of the Jesse-1A well, the upper Leadville reservoir
    flowed helium gas to surface at a raw gas rate of 1 million cubic feet per day (mmcfd).
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.