GGE great ann out -- 21 December 2023
Jesse-1A Flows 1 Million Cubic Feet of Gas Per Day - Amendment
• Significant Jesse-1A results demonstrate reservoir quality with measured helium concentrations trending up from 0.78%1 - consistent with the previously measured 1% helium from a downhole sample.
• Jesse-1A to be sidetracked for casing, completion and focused
stimulation ahead of production in early 2024
more news to come so lets see this go higher
- Forums
- ASX - Day Trading
- Morning Trading December 21
Morning Trading December 21, page-13
-
- There are more pages in this discussion • 201 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries