MTM announced 15th november ---Pomme Project increases as each...

  1. 2,774 Posts.
    MTM announced 15th november ---Pomme Project increases as each new
    set of drill hole assays is received and we anticipate obtaining the results for the remaining six holes
    from the drilling campaign within the next month.”
    The Pomme Project is located adjacent to the world-class Montviel REE-Nb deposit (owned by
    Geomega Resources Inc), that has a defined total indicated and inferred resource of 266 Mt @ 1.45%
    TREO & 0.14% Nb2O5.
    waiting results from remaining six holes
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.