RR1 waiting results - A total of 57 holes for 5,282m of RC drilling has been completed to date during Phase 2 drilling. ● The majority of all holes drilled across Phase 2, have reported multiple thick, stacked pegmatites1 within favourable metasedimentary and lesser mafic volcanic rock types
● Results from this part of the Phase 2 Drilling campaign are expected to be received in early 2024, with all samples already sent to the laboratory for analysis.