RR1 waiting results - A total of 57 holes for 5,282m of RC drilling has been completed to date during Phase 2 drilling.
● The majority of all holes drilled across Phase 2, have reported multiple thick, stacked
pegmatites1 within favourable metasedimentary and lesser mafic volcanic rock types
● Results from this part of the Phase 2 Drilling campaign are expected to be received in early
2024, with all samples already sent to the laboratory for analysis.
- Forums
- ASX - Day Trading
- Morning Trading January 8
RR1 waiting results - A total of 57 holes for 5,282m of RC...
-
- There are more pages in this discussion • 306 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)