RR1 waiting results - A total of 57 holes for 5,282m of RC...

  1. 2,769 Posts.
    RR1 waiting results - A total of 57 holes for 5,282m of RC drilling has been completed to date during Phase 2 drilling.
    ● The majority of all holes drilled across Phase 2, have reported multiple thick, stacked
    pegmatites1 within favourable metasedimentary and lesser mafic volcanic rock types

    ● Results from this part of the Phase 2 Drilling campaign are expected to be received in early
    2024, with all samples already sent to the laboratory for analysis.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.