GGE --- waiting - Significant Jesse-1A results demonstrate reservoir quality with measured helium concentrations trending up from 0.78%1 - consistent with the previously measured 1% helium from a downhole sample.
• Jesse-1A to be sidetracked for casing, completion and focused stimulation ahead of production in early 2024
- Forums
- ASX - Day Trading
- Morning Trading January 8