AZI - HIGH GRADE CHANNEL SAMPLE RESULTS FOR GORNO
- VCH002: 2.1m @ 20.1% Zn, 4.5% Pb, 53g/t Ag
- VCH017: 2.8m @ 43.2% Zn, 6.5% Pb, 68g/t Ag
- VCH018: 2.1m @ 34.0% Zn, 5.0% Pb, 48g/t Ag
- VCH028: 1.8m @ 28.4% Zn, 15.5% Pb, 141g/t Ag
LAT - Exceptional boulder rock chip samples returned from PSB, Finland
- Exceptional grades of up to 137.7g/t Au and 10.6% Cu received from boulder rock chip samples
FEG - HIGH GRADE GOLD AND WIDE ZONE INTERSECTIONS WITHIN THE VICTORY VEIN AT THE ALOE REK PROSPECT
- 20m @ 7.57 g/t Au, 8.5 g/t Ag (7.67 g/t AuEq) from 67.5m to 87.5m, including:
- 11m @ 13.45 g/t Au, 13.68 g/t Ag (13.61 g/t AuEq) from 70.5m to 79m and,
- 3.3m @ 31.64 g/t Au, 26.8 g/t Ag (31.96 g/t AuEq) from 75.8m to 79m
PEC - Discovery of High-Grade Tin mineralisation at Itinga Project along with anomalous Lithium, Rubidium, Niobium & Manganese
- Peak assay results of 7.4% Sn (74,000ppm Sn with 2,859ppm Tantalum)
- strong supporting results including: PECBT054: >1% Sn (>10,000ppm) – maximum detection limit reached
EVR - Rock chip samples of 71% Cu and 874g/t Ag: Cu-Ag-Au-Mo mineralisation pervasive at Khartoum
PNN - High-grade niobium, tantalum and REE mineralisation confirmed at Lĺtio Project, Brazil
- 63.7% Nb2O5 and 9.5% Ta2O5 with 2354ppm partial REO
- 43.5% Ta2O5 and 17.5% Nb2O5 with 1062ppm partial REO
- Close to boundary of SUM Equador Project
ASE - RED MOUNTAIN LITHIUM DISCOVERY BOLSTERED WITH MORE OUTSTANDING THICK INTERSECTIONS
- RMRC004: 83.8m @ 1,230ppm Li from 16.8m.
MXR - Spodumene-bearing pegmatites discovered at Larkinville
- 1.76% Li20 (SMX00982) - 1.48% Li20 (SMX00956)
MCT - Further Impressive Gold Intersections Returned at Yundamindra
- 11m @ 2.23 g/t Au from 31m (YMRC0039);
- 8m @ 1.5 g/t Au from 24m (YMRC0041);
- 4m @ 3.12 g/t Au from 12m (YMRC0001);
- 5m @ 1.62 g/t Au from 31m (YMRC0037)
AUE - Boundiali preliminary metallurgical test work delivers gold recoveries up to 99%
KZR - Mallina West Gold Project Exploration Update - Exploration activities are ongoing
TEG STX NZO - Ventia Rig Mobilising to Booth-1 Well Location
- Triangle set to spud Booth-1 well in North Perth Basin within a fortnight
GTR - LO HERMA RESOURCE DRILLING PERMITTED – RIG MOBILISING TO SITE
GSN - Drilling Recommencing at Duketon Gold Project
- Previous intercepts inc. 5m at 3.3 g/t Au from 49m, including 1m at 12 g/t Au in RC hole
RGL - Northern Zone Drilling Underway 25km East of Kalgoorlie
- Drilling is to target the shallower, up dip portion of the mineralised system that yielded a significant intercept of 18m at 4.14g/t Au from 36m
TG1 - Commencement of Pinnacles Gold Stage Two RC Drilling
- Stage one previous high-grade gold intercept of 4m @ 6.73g/t Au from 48 - 52m in RC drilling
I88 - Major Fault System & Magnetic Anomalies Identified at Talus Uranium Prospect
EG1 - EverGreen Intercepts Pegmatites at Bynoe
BPM - Phase 2 Drilling at Claw Gold Project Scheduled for August
GAL - Down Hole EM Survey Identifies Priority Drill Target
RMX - Gold exploration to commence at Fry Lake
GMN - RARE EARTH (REE) DRILL TARGETS DEFINED AT DOWN UNDER PROJECT, BRASIL
DRE - Drilling Commenced - Gifford Creek Nb-REE Carbonatite (100%)
LYN - Heritage Clearance Survey Complete West Arunta Stansmore Project
RRL - MCPHILLAMYS CONFIRMED AS A LONG-LIFE, LOW OPERATING COST PROJECT WITH ROBUST FINANCIAL METRICS
ASN - Anson Receives Approval for Drilling Programs at Mary Springs to Increase Lead Resource and Identify Critical Minerals
SPR - DEVELOPMENT CONTRACT FOR UNDERGROUND EXPLORATION DRILL DRIVE AWARDED TO BARMINCO
WDS - WOODSIDE TO ACQUIRE TELLURIAN AND DRIFTWOOD LNG
NGX - ACQUISITION OF URANIUM EXPLORATION PROJECTS IN NAMIBIA
PRN - Award of Spartan Resources contract and contract extensions totalling A$160M
CG1 - $24m Contract to Leading US Waste Management Business
DRO - Quarterly Activities/Appendix 4C Cash Flow Report
- 1H24 revenues of $24.1 million, up 110% on 1H23. P&L -1.9M before tax
CCV - FY2024 Unaudited Trading Update - FY24 Revenue +26%, $382.6m vs $302.7m
ASP - Aspermont reports a 32nd consecutive quarter of subscriptions growth - Group Revenue $5.0m, up 20% year on year
K2F - June Q4 FY2024 Quarterly Activities Report
- Annual Recurring Revenue (ARR) of $9.0m in Q4 FY2024, 20% higher than in Q4 FY2023
IRE - Iress announces expectations of significant increase in Adjusted EBITDA for 1H24
- Expectations for Adjusted EBITDA in the 1H24 period to be between $65m-$67m , up approximately 50% from $44m in the prior
DSE - Quarterly User Growth Reaches Record High - Annual Recurring Revenue (ARR1) of $39.9m, up 31% on the Previous Period
AGH - US Cannabis Beverage Joint Venture Agreements Signed
IMM - Immutep Announces Successful Meeting with FDA on Phase III Design in Non-Small Cell Lung Cancer
Expand