ENR - New West Arunta high-grade niobium intercepts – Crean &...

  1. 202 Posts.
    ENR - New West Arunta high-grade niobium intercepts – Crean & Emily
    - 46m @ 3.1% Nb2O5 from 60m to EOH including 4m @ 6.4% Nb2O5 from 84m (EAL239)
    - 18m @ 3.2% Nb2O5 from 76m including 2m @ 17.0% Nb2O5 from 76m (EAL238)
    - Aircore drilling has resumed at Crean to extend the high-grade mineralised trend westward
    - Emily - 16m @ 2.7% Nb2O5 from 50m to EOH (EAL260)
    - third batch of aircore samples, which includes priority samples from Green, has left site with assay results expected in July 2024

    BTR - HIGH GRADE GOLD ASSAYS RETURNED WITHIN MENZIES’ LADY SHENTON SYSTEM
    - 5m at 15.62 g/t Au from 104m, including 1m at 45.76g/t Au from 104m, and 2m at 10.96 g/t Au from 115m

    WC1 - OUTSTANDING DRILL RESULTS AT SALAZAR
    - 21m of 2,775 ppm TREO, 6.1% TiO2, 59 ppm Sc from 10m in SZA 306
    - 13m of 1,455 ppm TREO, 7.5% TiO2, 88 ppm Sc from 12m in SZA 307

    BM8 - Discovery of extensive mineralisation at Falcon Extension – surface rock chip assays up to 2.86% Li2O

    PMT - Patriot Extends Vega Zone with Standout Intercepts including 9.7 m at 5.16% Li2O and 35.3 m at 2.40% Li2O

    LAT - High-Grade Gold Intercept 22.4m @ 2.4g/t Au returned from KSB Project
    - 22.4m @ 2.4g/t Au, 0.07% Co and 0.16% Cu from 43.6m (L66K9DD010) Including:
    - 9.5m @ 3.7 g/t Au, 0.09% Co and 0.24% Cu from 51m
    - 4.3m @ 3.2g/t Au and 0.09% Co from 44m
    - Follow up drilling to be undertaken in August 2024

    ASE - HIGH-GRADE ROCK CHIP ASSAYS EXTEND PROSPECTIVE LITHIUM HORIZON AT RED MOUNTAIN PROJECT, USA
    - 4,150ppm Li, brown-green claystone sampled 490m north of RMRC002

    M4M - Rock chip sampling of Turner Iron Ore Project confirms substantial high grade CID target
    - 61.73% Fe, 64.71% Ca Fe, 1.46% Al2O3, 4.92% SiO2, 0.017% P, 4.61% LOI

    CMO - PHASE 1 DRILLING COMPLETED AT KANOWNA GOLD PROJECT
    - To follow up historical drill intercepts such as 18m @ 5.3g/t Au - Assay results are anticipated in the next two-three weeks.

    LMS - DRILLING CONFIRMS INTRUSION-RELATED BASE METAL SULPHIDES AT OUR WEST ARUNTA SILVER KING PROSPECT
    - Best intercept from exploration hole LMD001 is 15m @ 0.23% Cu, 0.31% Zn, 762ppm Pb, 4.8g/t Ag, 0.02g/t Au from 20m

    MEI - Caldeira Project Scoping Study confirms potential for the world’s lowest cost source of rare earths with outstanding financial metrics

    BTE - 42% INCREASE IN CBM RESOURCE
    - 42% increase in CBM 2C Contingent Resources to 454bcf from 317bcf (best estimate), ahead of expectations

    BMO - GOLD POTENTIAL IN UNDRILLED 1KM ARSENIC ZONE & ELEVATED MT IDA LITHIUM SOIL SAMPLING RESULTS - SPLIT ROCK DAM PROJECT (WA)

    THR - Drilling Commences - Alford West Copper ISR Project, South Australia

    REC - New copper mineralisation model at Brandy Hill South, WA to drive exploration
    - Previous drilling at Brandy Hill South intersected: o 33m @ 0.97% Cu from 59m

    RDM - MAIDEN TRIAL PRODUCT FROM SYBELLA RARE EARTH ORE
    - 48.7% of the MREC product is comprised of Total Rare Earth Oxides (TREO)

    CRR - Bulk Ore Sorting Testwork Achieves High Spodumene Recovery and Improved Feed Grades

    GBZ - Sale of White Dam Gold-Copper Project
    - Total consideration of $2.95 million in cash and a 1.5% net smelter royalty (capped at $2.5 million).

    ARL - Kalgoorlie Nickel Project - Goongarrie Hub DFS Underway

    GMN - Highly Anomalous Widespread Rare Earths Assays and Radiometric Anomalies confirmed on Down Under REE Project

    RMS - RECORD FY24 PRODUCTION OF 293KOZ & QUARTERLY CASH FLOW OF A$137.3M

    RRL - REGIS GROWS CASH AND BULLION BY A RECORD $109 MILLION IN JUNE QUARTER
    - 106.4koz of total Group gold production for the June 2024 quarter.
    - 417.7koz of total Group gold production for FY24 which is within Group FY24 production guidance.
    - Record cash and bullion position of $295M at 30 June 2024, up a record $109M from $186M at 31 March 2024.

    EMR - Record Full Year Production of 114koz Achieved at Okvau Gold Mine

    KAI - Kairos appoints GR Engineering for Scoping Study on 1.6Moz Mt York gold project

    RED - Repayment of King of the Hills Project finance facility and preliminary June Quarter sales results
    - Sales for the quarter were 110,818 ounces of gold and 165 tonnes of copper

    PLN - Early Exploration Agreement Executed with Slate Falls First Nations for Root Lake

    BCM - BCM EXPANDS EMA PROJECT EXPLORATION AND DEVELOPMENT PROGRAM ON MULTIPLE WORK FRONTS
    - Four exploration auger rigs have commenced operating within the Ema central highgrade zone, over a 12-week program

    MGT - HEADS OF AGREEMENT WITH JFE SHOJI AUSTRALIA PTY. LTD

    CXO - FY24 Production and Financial Position Update

    BCB - Completion of sale by BCB 10% of Broadmeadow East Mine
    - A$13M cash consideration received by BCB from Formosa Group.

    RC1 - Trading Halt - pending an announcement in relation to its diamond drilling campaign at Queen Alexandra.

    I88 - Trading Halt - pending an announcement regarding material exploration results at its Portland Creek Uranium Project

    EPX - EP&T Global Limited - Projected ARR target exceeded - Annualised Recurring Revenue (ARR1) as at 30 June of $13.6m, up $1.9m or 16% since June 2023

    SKS - expects total annual revenue for FY24 to be approximately $130+ million, up from the previously expected forecast provided to the market of $120+ million

    AHC - Austco Healthcare Ltd Secures $5.0m Contract to Supply New Surrey Hospital with Industry-Leading Tacera System
    - Contract win boosts Austco Healthcare Group’s contracted orders to a record $46.2m

    CEN - Significant Tauhara milestone supports expected dividend uplift
    - expected EBITDAF for FY25 is $770m, materially higher than expected in FY24

    A1N - Cody secures Hong Kong buses contract with KMB
    - The contract has a term running to 30 June 2030 and provides expected annualised contract revenues of over A$35 million

    XST - A$4m ASSET SALE COMPLETED
    - Received the final payment of US$1,327,273

    EMV - STAGE 3 RECRUITMENT TARGET ACHIEVED AND VALIDATION TRIAL FDA ENGAGEMENT UNDERWAY

    4DX - 4DMedical expands with Jones Radiology contract
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.