WA1 - HIGH-GRADE INTERCEPTS CONTINUE ACROSS LUNI Best new intersections, predominantly from 100m spaced drillholes, include: LUDD23-004 from 52.5m: 17.1m at 2.7% Nb2O5 LUDD23-007 from 66.0m: 35.0m at 2.2% Nb2O5 and from 126.6m: 40.1m at 3.2% Nb2O5 (to EOH) LUDD23-012 from 64.0m: 16.0m at 3.6% Nb2O5 LUDD23-017 from 83.0m: 45.0m at 1.2% Nb2O5 including from 84.0m: 8.0m at 4.5% Nb2O5 LUDD23-022 from 52.0m: 82.0m at 1.6% Nb2O5 including from 53.0m: 18.0m at 4.1% Nb2O5 LUDD23-026 from 40.8m: 11.3m at 1.9% Nb2O5 LUDD23-029 from 82.3m: 12.7m at 1.9% Nb2O5 LUDD23-031 from 126.0m: 10.3m at 5.2% Nb2O5 LUDD23-032 from 90.0m: 59.0m at 1.4% Nb2O5 including from 93.0m: 20.0m at 2.5% Nb2O5 LURC23-245 from 38m: 92m at 1.2% Nb2O5 LURC23-246 from 51m: 55m at 1.2% Nb2O5 including from 53m: 23m at 2.4% Nb2O5 LURC23-247 from 37m: 93m at 1.4% Nb2O5
ITM - DIAMOND DRILLING CONFIRMS GRAPHITE MINERALISATION FROM SURFACE TO OVER 200M DEPTH AT LACROMA CENTRAL o LADD24-001 – 87m @ 6.3% TGC from 7m incl 13m @ 10.3% TGC from 41m and 7m @ 8.7% TGC from 62m o LADD24-002 – 84m @ 7.2% TGC from 13m incl 21m @ 10.3% TGC from 70m and 15m @ 5.7% TGC from 108m o LADD24-003 – 78m @ 7.3% TGC from 25m incl 43m @ 8.7% TGC from 42m and 5m @ 6.5% TGC from 114m o LADD24-004 – 8m @ 6.4% TGC from 43m and 2m @ 7.9% TGC from 134m and 82m @ 6.7% TGC from 154m incl 26m @ 8.6% TGC from 183m o LADD24-005 – 14m @ 6.4% TGC from 62m and 24m @ 6.7% TGC from 132m and 36m @ 7.7% TGC from 171m incl 12m @ 9.8 TGC from 191m
BTR - FURTHER ASSAY RESULTS FROM LINK ZONE CONFIRMS NEARSURFACE MINERALISATION ACROSS MULTIPLE LODES • Results produced a number of high-grade intercepts, confirming mineralisation within and outside A$3,000/oz Au optimised pit shells at shallow depths • Intercepts returned at Link Zone include: o LZRC24029: 9m @ 4.4 g/t Au from 18m, including 1m @ 29.1 g/t Au from 18m o LZRC24011: 18m @ 1.2 g/t Au from 4m o LZRC24016: 1m @ 20.2 g/t Au from 16m o LZRC24013: 9m @ 1.75 g/t Au from 23m o LZRC24021: 5m @ 2.0 g/t Au from 2m, 4m @ 2.4g/t Au from 14m • Assays pending for 52 drillholes drilled at the Lady Shenton System targeting areas for infilling and resource confidence growth • RC drill rig has commenced drilling at Second Fortune Gold Mine
CTN - Resampling Upgrades Gold and REE Targets at Laverton Resampling of mineralized gold intervals returned best results including: LVAC009 1m @ 2.42g/t Au from 75m LVAC012 3m @ 1.07g/t Au from 49m • Re-sampling of mineralized REE intervals returned best results including: LVAC023 1m @ 16,426ppm TREO from 28m LVAC022 1m @ 2,633ppm TREO from 37m LVAC022 5m @ 2,777ppm TREO from 52m LVAC009 1m @ 7,220ppm TREO from 43m LVAC009 4m @ 2,506ppm TREO from 75m
ARD - $2.5M PLACEMENT COMPLETED TO ADVANCE KEMPFIELD DRILLING PROGRAM Funds from the raising will be used to undertake a follow-up reverse circulation (RC) drilling program at Kempfield Project which is currently being designed and expected to proceed in the next quarter, pending relevant regulatory approvals.
AKO - Bekisopa high-grade iron ore DSO Mineral Resource Estimate increases by 42% to 7.9 million tonnes.
SGQ - EXPLORATION ADVANCES AT THE DESTINY PROJECT, WESTERN AUSTRALIA - Niobium-REE potential at large intrusive target continues to grow - Closed-spaced gravity survey to be completed at C1 next month ahead of finalisation of drill targets
THB - $4.1 Million Secured to Drill Flagship Hidden Bay Uranium Project - 2,400m drill program planned for Hidden Bay Uranium Project to begin in August 2024 - Airborne geophysics planned for Surprise Creek Uranium Project that has historical drill hole results up to 2.1 m @ 4 .37% U3O8.
MEU - Drill Program for exciting uranium target at Yolanda - 75 Drill holes have been planned
KCC - New Major, Completely Unexplored Porphyry Complex and Drill Targets Secured
AUH - Austchina Mobilises for Maiden Drilling at Chenene Lithium Project - Drill rig has mobilised on site for the maiden drilling program, targeting multiple high-priority lithium targets.
I88 - Infini Acquires Bellah Bore East Uranium Deposit - Bella Bore East (P 53/1703) located adjacent to the Yeelirrie North Uranium Project hasbeen acquired in a strategic tenement consolidation
EQR - MT CARBINE INFILL DRILLING REVEALS ADDITIONAL HIGH-GRADE ORE IN STAGE II WASTE CUTBACK AREA - Vein intersections with true widths of 0.3-2.5m and WO3 grades ranging from 0.5% to 5.03%: - Significant results include 22m @ 0.39% WO3 and 9m @ 0.84% WO3 (243m RL and 253m RL respectively).
GAL - MINERAL RESOURCES LITHIUM JOINT VENTURE AGREEMENT - Farm-in and joint venture agreement (“Exploration JVA”) executed with a 100% owned subsidiary of Mineral Resources Limited (ASX: MIN) (“MinRes”) - Galileo sells 30% of its lithium rights on the Norseman Project (“Project”) tenements2 for a purchase price of $7.5m
STX - Successful Walyering-7 Appraisal • Walyering-7 has intersected a high-quality conventional gas accumulation
VUL - Strategic investments by CIMIC Group and Hancock Prospecting
PAT - DRILL PROGRAM UPDATE - planned 2024 drilling program has been temporarily suspended.
IIQ - BREAKTHROUGH EXOSOME THERAPY TO TARGET AND KILL BREAST CANCER
TLX - Telix Completes TLX250-CDx (Zircaix®) BLA Submission for Kidney Cancer Imaging
IMM - Immutep Announces Clinical Collaboration with MSD to Evaluate Efti in Combination with KEYTRUDA® (pembrolizumab) in Pivotal Phase III Trial
NGI - NGI expects FY24 Adjusted EBITDA of USD85.0 to 89.0 million (AUD129.8 to 135.9 million1) increase of between 76% and 84% on FY23
NXL - Statutory EBITDA for the full year FY24 is likely to be in the range of $55 - $60 million (this compares to the range of $47 - $52 million which was previously announced on 20 May 2024)
EXT - Revenues from ordinary activities up 17% to $8,002,257
SCL - Data Incident Schrole has experienced an incident which it understands has resulted in a third party obtaining unauthorised access to personal information of certain candidates who had registered on the Schrole platform.