SHN - Step out holes hit thick, high-grade gold-copper, Liontown
- 16.2m @ 4.54g/t Au, 1.11% Cu (from 319m, 24LTDD024)
Including 6.2m @ 9.00g/t Au, 2.52% Cu (from 329m, 24LTDD024)
- 16.7m @ 3.73g/t Au, 0.53% Cu (from 229m, 24LTDD011)
Including 7.7m @ 6.43g/t Au, 0.85% Cu (from 238m, 24LTDD011)
SPR - PEPPER CONTINUES TO GROW – 25.24m @ 16.66g/t gold
RMS - Cue Project Approved for Commencement
- 12.0Mt at 2.4g/t Au for 910koz (total)
- Payback of 7 months
AZY - GEO-01 GOLD MINERALISATION STRIKE DOUBLED
26m at 0.7 g/t gold from 16m down hole in 24MYC0449, including:
− 11m at 1.2 g/t gold from 17m down hole
− 1m at 1.3 g/t gold from 38m down hole
AAR - KAMPERMAN CONTINUES TO GROW AHEAD OF MAIDEN MINERAL RESOURCE ESTIMATE
• 28 metres at 1.99g/t Au from 68 metres including 1 metre at 12.2g/t Au from 89 metres in FRC295;
• 17 metres at 1.60g/t Au from 32 metres in FRC301;
AWJ - RC Drilling at Spargoville – Fugitive Prospect
- Results include 2m @ 3.82g/t Au, 3m @ 1.18g/t Au and 1m @ 6.08g/t Au within a broader mineralised zone.
EQN - Trading Halt - pending an announcement regarding material exploration results
NVO - SIGNIFICANT RESULTS FROM DIAMOND DRILLING AT BELLTOPPER, VICTORIA
• 5.6 m @ 3.14 g/t Au from 219.8 m and 4.25 m @ 5.88 g/t Au from 274.75 m
(including 2 m @ 11.15 g/t Au) and 1.94 m @ 2.37 g/t Au from 230 m in BTD001 on the Leven Star Reef.
G11 - HIGH GRADE COPPER INTERCEPTS AT WILANDRA CENTRAL
- 9m at 2.68% Cu from 310m (GR24RC014) including 6m at 3.46% Cu from 311m;
SPQ - STEAM ENGINE GOLD PROJECT 2024 Resource expansion drilling and mining studies
Lower Grade, Owner-Operated Processing Plant Model (lower cut-off grade of 0.25 g/t Au)
- 4.18 Mt @ 1.5 g/t Au for 196,000 oz Au
High Grade, Toll Treatment Model (higher cut-off grade of 1.0 g/t Au)
- 2.72 Mt @ 2.0 g/t Au for 171,000 oz Au
CMO - COSMO EXPANDS FOOTPRINT ALONG KANOWNA GOLD PROJECT TREND
• historical drill intersections such as:
- 44m @ 2.4g/t Au from 24m, incl. 18m @ 5.3 g/t Au from 18m (FVRC50)
- 50m @ 1.2g/t Au from 30m to End-of-Hole incl. 10m @ 4.7g/t Au from 32m (FVRC052)
CND - Evidence for Multiple Petroleum Systems Confirms Oil & Gas Plays in Peruvian TEA
SNG - Siren Awarded High-Grade Lyell Tenement for a Further 5 Years
Previous results at Lyell from trenching and surface sampling include:
• 7m @ 13.8g/t Au (LYTR001) (ASX release 14 October 2022);
• 8m @ 6.3g/t Au (LYTR002) (ASX release 14 October 2022);
• 3.0m @ 19.1g/t Au (LYTR009) (ASX release 8 March 2023); and
• 1.1m @ 36g/t Au (LYTR008) (ASX release 8 March 2023).
TM1 - MAIDEN DRILL PROGRAM COMPLETED AND STRIKE EXTENDED 82% AT DANTE REEFS
• Assays are pending from 52 drillholes (~8,500m)
VMM - Globally Significant Colossus Rare Earth Ionic Adsorption Clay Project Maiden Mineral Resource Estimate
- 201Mt @ 2,590ppm TREO achieved exploring only ~7% of Colossus Project Area
WGR - Metallurgical and Geotechnical Diamond Drilling Completed Successfully
- Drill core has been logged and photographed and the selected intervals have
now arrived in Perth for assay analysis and metallurgical testing.
88E - Project Leonis: Maiden Prospective Resource Estimate Complete
Total estimated net mean Prospective Resource of 381 million barrels (MMbbls) of oil recoverable from the Upper Schrader Bluff Formation (USB).
BNL - SIGNIFICANT HELIUM DISCOVERY AT STATE 16 WELL GALACTICA PROJECT
EMU - “Significant and Pervasive” Copper Mineralisation Discovery Confirmed by pXRF Geochemistry Survey at Fiery Creek
- highest copper grade recorded was 32.5% from 27 rock chip samples
PGD - TIN CAN DRILLING COMPLETE
- results due in coming weeks
KLI - Exploration recommences at Queensland copper-gold targets
Field work has re-commenced at the two exciting copper gold targets following up 7.2% Cu and 12.4g/t Au rock chip results.
BPM - Claw Gold Project – Exploration Update
- Phase 2 AC/RC drilling program on schedule to commence in July 2024 at Claw.
DRE - Cu-Au Drilling to Commence at Tarraji-Yampi (80%, 100%)
- to commence in early June 2024
CHR - Lake Johnston Drill Approvals Received
- 5,000m of drilling and are planned to commence this month
IBG - IRONBARK ACQUIRES TWO HIGHLY PROSPECTIVE COPPER PROJECTS IN MT ISA, QLD
NAE - Gravity survey enhances gold targets at Wagyu Project, Central Pilbara, WA
EVO - Revenue up 15.7%, $18.5m to $21.4m
VFX - revenue: Projected to exceed $8.1 million, a 25% increase from FY23
AL3 - AML3D WINS SA GOVERNMENT GRANT FOR $2.24 MILLION TECHNOLOGY INVESTMENT
LDX - Lumos Receives Second US$5.0 million Hologic IP Agreement Payment
LTP - Trading Halt - pending clinical trial results of its pivotal study of SPONTAN® Nasal Spray treatment of Erectile Dysfunction
OIL - Optiscan Reveals InVue™ Imaging Device for Precision Surgery
GSS - FDA Clearance for Gastrointestinal Parasite Detection Kit