ANX -- ann out last night --- drilling commenced
Drilling commenced at Wyloo Dome Gold JV
• Program consists of a minimum of four reverse circulation drill holes at the New
Morning Prospect totalling ~1,000m drilling
• Holes designed primarily to test a blind AEM conductor coincident with a large
amplitude VTEMTM MAX anomaly
• Infill auger follow-up sampling completed at Ravensthorpe Projects targeting
lithium, gold and base metals
LOM -- ann out
GMN -- ann out
- Forums
- ASX - Day Trading
- Morning Trading March 21
ANX -- ann out last night --- drilling commencedDrilling...
-
- There are more pages in this discussion • 269 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)