FHS 20 May 2021 Drilling underway at El Dorado Copper Gold...

  1. 3,554 Posts.
    lightbulb Created with Sketch. 138
    FHS

    20 May 2021

    Drilling underway at El Dorado Copper Gold project

    ▪ 1,500m, three-hole diamond drill program has commenced at highly prospective El Dorado project
    ▪ Program designed to test high intensity Induced Polarisation anomaly and other targets
    ▪ Follows completion of very encouraging geophysical work undertaken by the company during 2020
    ▪ Drill program expected to take 5-6 weeks with assay results expected within 5 weeks after
    Freehill Mining Limited (ASX: FHS ‘Freehill’ or ‘the Company’) is pleased to advise that it has commenced a three-hole
    1,500 metre diamond drill program at its 100%-owned El Dorado project in Chile. The rig is currently drilling the first of
    three targets (see image 1 below). El Dorado is a 750-hectare tenement that is highly prospective for copper and gold. It
    directly adjoins Freehill’s 67Mt Yerbas Buenas magnetite project.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.