Morning Trading May 26, page-4

  1. 9,665 Posts.
    lightbulb Created with Sketch. 608
    MTM - diamond drilling commence at Pomme REE-Nb project.

    the two historical drill holes drilled on the target, which included:
    MVX-12-01 – 508.3m @ 0.43% TREO, 413ppm Nb2O5 and 1.48% P2O5, from 73.7m depth, and
    MVP-12-02B – 478.1m @ 0.12% TREO, 340 ppm Nb2O5 and 2.14% P2O5, from 25.9m to EOH.

    The project is located only 7km from the world class carbonatite-hosted Montviel Deposit which has a total Indicated and Inferred resource of
    266 Mt @ 1.46% TREO and 0.14% Nb2O5

    Lookalike to Montviel REE deposit

    Pomme has the potential to define similar resource size as Montviel that has 372.4kt contained Nb2Ob that has value of ~AU$69,000/t


    https://hotcopper.com.au/data/attachments/5303/5303344-4c644161aecb484a398d124468884bb6.jpg
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.