AUE - Aurum hits 163 g/t gold within 12m @ 14.56 g/t gold at Boundiali BD Target 1
• Step-back diamond drilling (355.5m) at BD Target 1 on the Boundiali BD tenement returns
shallow, wide high-grade gold hits1 including:
o 12.22m @ 14.56 g/t Au from 275m inc. 1m @ 163.42 g/t Au (DSDD0051)
• Intercept is ~60m down dip from 4m @ 22.35 g/t Au from 226m (DSDD0004)2 and ~230m
More assay results from BD Targets 1, 2 and 3 are expected over the coming weeks
FG1 - Up to 67g/t Au Intersected in Drilling at Trafalgar, NE Tasmania
• Multiple high-grade gold veins intersected in drill hole TFDD016, including:
• 0.4m @ 67.6g/t Au within 1.3m @ 21.9g/t Au from 248.7m;
• 0.3m @ 39.2g/t Au from 243.2m;
• 0.5m @ 35.1g/t Au within 1.4m @ 12.7g/t Au from 164.6m (Trafalgar Main Vein);
• 0.3m @ 19.0g/t Au within 0.65m @ 10.5g/t Au from 187.55m (Magazine Vein);
• 0.3m @ 12.3g/t Au within 1.2m @ 3.5g/t Au from 233.0m;
• 0.4m @ 10.8g/t Au from 135.2m.
AR1 - High-Grade Copper Mineralisation Intercepted in the ‘Saddle’ of Flying Horse Pit
o MTKD019 (Sulphide)
▪ 40m @ 2.27% Cu from 132m (12.89m true width)
▪ Including 16m @ 4.71% Cu from 150m (5.15m true width)
AUN - DRILLING HITS 18m @ 25.8g/t Au AT PLUM PUDDING DEPOSIT
KCN - Continued Significant Gold Exploration Results at Chalawan and Kumpee Prospects
Including:
[email protected] g/t Au from 0 to 9m, including
[email protected] g/t Au from 2m to 6m.
EMC - PHASE-1 RESOURCE DRILLING SUCCESSFULLY CONCLUDES AT MT EDON CRITICAL MINERAL PROJECT
Pegmatite intersections include;
o MD 50 – 125m from surface to 125m
o MD 45 – 89m from 34m to 123m, plus 10m intercepted from 5m to 15m
o MD 35 – 89m from 37m to EOH at 126m open
o MD 25 – 50m from 46m to 96m
o MD 24 – 40m from 8m to 48m
o MD 27 – 35m from 34m to 69m
ALM - Drilling at the Briggs Copper Project Set to Recommence
LOM - Lulo Recovers 195 Carat Type IIa Diamond
MZZ - Matador’s RC Program Identifies New Large Gold Zone Over 1.2 km Strike at Malachite O-2 Target
BSN - DRILLING AT GEIKIE IDENTIFIES 1.5KM ALTERATION ZONE TYPICAL OF BASEMENT-HOSTED MINERALISATION
RMX - ADDITIONAL ANOMALOUS RARE EARTH CLAY RESULTS AT MONJEBUP
WCN - Nunavut Cu-Au-Ag Project primed for imminent field activities to commence with top targets identified
E79 - Option to Acquire the Highly Prospective Mountain Home Copper-Gold Project, NT
L1M - Completion of Due Diligence and Start of Work Program – Brazil Lithium Projects Acquisition
Contract geologists to begin on ground reconnaissance works this week
AQD - COPPER DRILLING COMMENCES IN PERU
Drilling underway to test new copper-gold target at Cerro de Fierro.