R1 ann out -- INITIAL DRILLING CONFIRMS LITHIUM SYSTEM at...

  1. 2,957 Posts.
    R1 ann out -- INITIAL DRILLING CONFIRMS LITHIUM SYSTEM at Morrissey Hill.

    Waiting now for assay results from
    Yinnethara Projects
    Camel Hill
    • Outcropping pegmatites with LCT potential
    • Geological setting is similar to Morrissey Hill with the
    fertile Thirty-Three Supersuite and Leake Springs
    Metamorphic contacts
    • Geochemical soil assays due late October
    Wabli Creek•
    Source of high-grade niobium up to 14.3 % Nb2O5 * and
    2.57% TREO with 88% heavy rare earth oxide (HREO) **
    • Results confirmed as a rare element pegmatite
    swarm with niobium, yttrium, fluorine (NYF)
    geochemical signature. Awaiting geochemical soil
    assays late October
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.