FL1 moving up new all time high 70.5c. Assays due next week for...

  1. 2,718 Posts.
    lightbulb Created with Sketch. 224
    FL1 moving up new all time high 70.5c. Assays due next week for the 112m spod drill intercept.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.