Morning Trading November 3, page-2

  1. 2,722 Posts.
    SHP good ann out - MOU EXECUTED FOR EXISTING SHAFT AND INFRASTRUCTURE UTILISATION
    Key benefits to the collaboration include:
    1. Majority of land to be utilised is already designated industrial land, for streamlined permitting pathway;
    2. Access to power, water and gas, for reduced utility capital;
    3. Proximity to surface infrastructure such as rail and road, for ease of access and logistical optimisation;
    4. Improved access to the underground orebody, significantly reduces potential development capital cost;
    5. Meets ventilation requirements for underground operations, further improving shaft capital outlay;
    6. Provides potential underground access to additional orebodies on existing South Harz permits for enhanced
    project scalability.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.