BPMCompleting drilling along strike of the following hole: 30m @...

  1. 51 Posts.
    lightbulb Created with Sketch. 13
    BPM

    Completing drilling along strike of the following hole: 30m @ 1.84g/t Au (from 25m) including 5m @ 7.12 g/t Au (from 35m)
    Results expected "mid-Oct", so imo that's between 10th-19th Oct... so the next 3-13 days

    Just completed a CR so cash is good for further exploration expected in Dec 24
    $7.7m market cap = $3.0m cash + $4.7m ev

    1klm down strike from CMMs ~3m oz MRE ($2.13bln cap)

    Chart showing an Ascending Triangle timing well with expected assays:
    https://hotcopper.com.au/data/attachments/6514/6514048-7a70a5fb129d9dfe910f1ced64fb3a0c.jpg

    https://hotcopper.com.au/data/attachments/6514/6514050-fa45b779d1b6889dc9a242e9f76f3471.jpg


 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.