MTH - Mithril Drills 144 g/t Gold, 1,162 g/t Silver over 7.0 metres
- 33.00m @31.8 g/t gold, 274 g/t silver from surface, including
- 7.00m @ 144 g/t gold, 1,162 g/t silver from 18m Including
- 2.00m @ 495 g/t gold, 3,765 g/t silver from 20m plus including
- 1.00m @ 26.9 g/t gold, 201 g/t silver from 28m
DRE - More Thick Niobium Intercepts from Gifford Creek Carbonatite
- CBRC176: 50m @ 0.9% Nb2O5 from 49m, including 20m @ 1.3% Nb2O5 from 56m (Stinger)
- CBRC174: 38m @ 0.5% Nb2O5 from 58m, including 6m @ 1.2% Nb2O5 from 60m (Stinger)
- CBRC175: 66m @ 0.4% Nb2O5 from 52m, with 15m @ 15.0% P2O5 from 103m (Stinger)
- CBRC189: 24m @ 0.6% Nb2O5 from 39m, including 6m @ 1.0% Nb2O5 from 48m (Stinger)
- CBRC179: 9m @ 0.3% Nb2O5 from 60m and CBRC185 6m @ 0.2% Nb2O5 from 69m (Rocky Road)
AW1 - Thick high-grade copper in deep drilling at the Storm Project, Canada
- 10m @ 1.2% Cu from 311m downhole, including,
- 3m @ 2.2% Cu from 315m downhole, including,
- 0.5m @ 3.7% Cu from 315.5m downhole
SFR - SANDFIRE PORTUGAL EXPLORATION UPDATE
- DRILLING EXTENDS HIGH-GRADE POLYMETALLIC ZONE AT THE SESMARIAS PROSPECT, PORTUGAL
- Drillhole SES24-054 intersected 41.2m at 1.59% Cu, 3.36% Zn, 1.71% Pb, 54.90 ppm Ag from 377.2 – 418.4m downhole.
- Includes a higher-grade zone of 11.0m at 2.16% Cu, 7.90% Zn, 3.96% Pb and 113.24ppm Ag from 385.8 – 396.8m.
TMG - TRIGG ACQUIRES ULTRA HIGH-GRADE ANTIMONY PORTFOLIO, GRADING UP TO 63% ANTIMONY
VMC - COPPER HILLS PROJECT SIGNIFICANT GRAVITY RESPONSES SEMI-COINCIDENT
WITH CIRCULAR MAGNETIC/AEM ANOMALIES IDENTIFIED
M24 - Canary Project Drilling Results
RR1 - HIGHLY ANOMOLOUS SAMPLES CONFIRM DRILL READY TARGETS
WSR - Mindoolah Gold Mining Centre Field Program Completed
- assay processing time 4-5 weeks
DM1 - Desert Metals commences sampling and surveys to define drill targets at Adzope gold project, Côte d’IvoireHAW - Mt. Bevan Iron Ore Joint Venture: Election to convert to a 1% RoyaltyIRD - AMP ENERGY CAPE HARDY MILESTONE PAYMENTS COMMENCE- FIRB approval unlocks initial 2024 $4.5 million paymentsINR - Ioneer’s Rhyolite Ridge Project Clears Major U.S. Federal Permitting Step, Advances Toward Construction
PV1 - Provaris advances the Prototype Tank restart program
GNG - Design and Construct Contract – Woodlawn Restart Project- The contract value is $25.7 millionSKS - $22 million Data Centre Contract Secured- increases our revenue forecast for FY2025 to approximately $260 million
BAP - DIVESTMENT OF MTQ ENGINE SYSTEMS
REG - Acquisition of two quality homes on Melbourne’s Mornington Peninsula and update on recent aged care reforms
- executed binding agreements to acquire two high-quality residential aged care homes for net consideration of $35.5 million
KLS - AWARD OF COLORADO MOTORCOACH TRANSIT CONTRACT
ATX - FDA FAST TRACK DESIGNATION FOR NARMAFOTINIB IN ADVANCED PANCREATIC CANCERPAB - PAT-DX1 GMP specification testing update
TCF - Proposed buyback of up to 10% of issued capital
- Forums
- ASX - Day Trading
- Morning Trading September 20
Morning Trading September 20, page-3
-
- There are more pages in this discussion • 246 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)