Morning Trading September 22, page-16

  1. 6,497 Posts.
    lightbulb Created with Sketch. 175
    ERM
    Wakey wakey, over sold

    Completed and waiting results

    Extensional drilling underway at high-grade copper-gold-cobalt and bismuth
    Hermitage Project
    An extensional diamond and reverse circulation (RC) drilling program has commenced at Emmerson’s 100% owned Hermitage
    Project at Tennant Creek.
    Key highlights include:
    • Minimum 2,000m, 11 drill hole program is aimed at testing for extensions of the mineralisation that remains open to the
    north, east, west and down plunge of the discovery holes:
    o Diamond drill hole HERCDD010 intersected 94.4m at 2.74% copper, 5.58g/t gold, 17.88g/t silver, 0.44% bismuth
    and includes ultra-high grades from the brecciated main ironstone (from 85m down hole) (ASX: 17 August 2022).
    o RC drill hole HERC003 intersected 116m at 3.38% copper and 0.88g/t gold that includes zones of significantly
    high-grade copper and gold (from 76m down hole).
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.