CAY - 800% increase in resource or so? massive imo? Significant...

  1. 13,940 Posts.
    lightbulb Created with Sketch. 3162
    CAY - 800% increase in resource or so? massive imo?

    Significant Resource Upgrade on Tier-1 Minim Martap Bauxite ProjectHighlights
    ❖ Total Resource increased by 62% over previous resource estimate to:892 Mt at 45.1% Al2O3, 2.8% SiO2 (Cut-off Grade 35% Al2O3)
    Total Indicated Resource increased by 850%, now:839 Mt at 45.2% Al2O3, 2.8% SiO2❖ Includes a high-grade (Cut-off Grade 45% Al2O3) Indicated resource of431Mt at 48.8% Al2O3, 2.6% SiO2 (total) containing substantial zones of>50% Al2O3 with very low contaminants.
    ❖ Resource upgrade confirms the Minim Martap Project as a global Tier 1bauxite project, a “Guinea style” bauxite deposit strategically located inCameroon.
    Substantial exploration upside as <50% of the project’s plateaux drilled.❖ Laboratory testing indicates a gibbsite-dominant bauxite with very lowboehmite levels, suitable for low temperature refineries.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.