AEV 0.00% 0.4¢ avenira limited

morocco prod target 10 years away, page-47

  1. 8,880 Posts.
    Alan and Meerkat, G'day.
    Arruwarra drilling is the key to early prod, as soon as 12 months IMHO, MAK have indicated that they have 30% on or near surface [no beni required], they will drill these high areas spaced closely, if consistant over a small area it is very feassible to commence early to generate cash for the main game, even 300 to 500,000t over 12 months is very profitable.
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $9.396M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
23 19766301 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 1280661 4
View Market Depth
Last trade - 11.04am 22/07/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.