ASN have the infra structure a extraction well drilled already...

  1. 13,218 Posts.
    lightbulb Created with Sketch. 274
    ASN have the infra structure a extraction well drilled already at GR UIC wells are around $230k each... so you can eliminate most of that cost.
    EMP need to pay for 3rd party carbonation plant, SALTWORKS ..$232mill ... ASN have their own propriety system so will be a lot cheaper I'm sure...

    Nice work SJD , is it ok if I use that abbreviation ?
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.