MAY 6.00% 5.3¢ melbana energy limited

The reported numbers are the reported numbers. .. these are...

  1. 2,636 Posts.
    lightbulb Created with Sketch. 4670
    The reported numbers are the reported numbers.

    .. these are important numbers and good or bad these should not be dismissed

    And yes the fact that Melbana have to give the numbers to an independent auditor show exactly how important they are..

    ... for example what were the reported numbers from theA-2EPT ... near silence from the rampers ... [~300bbls/d] ?API

    As for flow rate (BOPD) I'm not sure who to believe but it aint yourself my good friend?

    Because to do so would mean I accept that Melbana has lied to everyone else through using inflated numbers & I just can't see that happening tbh. h8tey

    https://hotcopper.com.au/data/attachments/5968/5968751-e1109409a9e89dded49dfe0e9a34f20d.jpg

    https://hotcopper.com.au/data/attachments/5968/5968750-24c04f182477e2bb61b7b50046bd1887.jpg

    https://hotcopper.com.au/data/attachments/5968/5968754-59351315bd74eea23bb196675cd7ac47.jpg


    https://hotcopper.com.au/data/attachments/5968/5968753-5fe7df64eda8f3ecadad106cf0510516.jpg
    • Melbana Energy (MAY) completes a final flow test of lighter oil to the surface at the Alameda-2 appraisal well in its Cuban gas project
    • Peak flows to the surface result in 1903 barrels of oil (BOE) per day from unit 1B at an average and stabilised flow rate of 1235 BOE per day
    • Melbana is developing a field plan for its tenement of wells, known as Block 9, and it’s reviewing the recent testing results to accelerate quicker production
    • The next appraisal well Alameda-3 will test the lower two geologically independent oil-bearing formations intercepted at Alameda-1

    Melbana Energy (MAY)has successfully conducted a final flow test of lighter oil to the surface at the Alameda-2 appraisal well in its Cuban gas project.

    The peak flow to the surface resulted in 1,903 barrels of oil (BOE) per day from unit 1B, with an average stabilised flow rate of 1,235 BOE per day.

    During the testing, more than 1000 barrels of oil were produced and transported away.

    “Unit 1B has really delivered, as we hoped would be the case given the high fracture density and excellent permeability and porosity we observed in the logs when drilling through that unit,” MAY Executive Chair Andrew Purcell said.

    “To recap, the Alameda-2 appraisal well produced oil to the surface from Unit 1A, achieved strong flow rates of a higher quality crude from Unit 1B, proved the existence of moveable oil from Unit 3 and confirmed a significant increase in logged Net Pay to 615 metres TVD (with fractures) for the Amistad sheet in total – about 45 per cent of the gross section.

    “We’re also now reassessing whether there may be value in not abandoning Alameda-1, which is the current plan, before commencing Alameda-3 to appraise the two deeper intervals.”

    Melbana has developed a field plan for its tenement of wells, known as Block 9, and is reviewing the recent testing results to support the potential to accelerate the project into quicker production.

    The next appraisal well, Alameda-3, will test the lower two geologically independent oil-bearing formations intercepted at Alameda-1.

    Last edited by Hateful8: 18/02/24
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.003(6.00%)
Mkt cap ! $178.6M
Open High Low Value Volume
5.4¢ 5.4¢ 5.0¢ $154.8K 2.985M

Buyers (Bids)

No. Vol. Price($)
1 100000 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 113206 1
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
5.3¢
  Change
0.003 ( 4.33 %)
Open High Low Volume
5.4¢ 5.4¢ 5.0¢ 1347067
Last updated 15.56pm 03/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.