Fellowes
Remember that the average output of a wind turbine is 25-35% of the installed capacity, due to the variability of the wind and the need to trip production out at excessive wind speed to prevent equipment damage, whilst GDY willl have at least 90% of capacity available at all times.
I therefore fail to see how this is negative to GDY.
RB
- Forums
- ASX - By Stock
- RNE
- moves in wind-power
moves in wind-power, page-6
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add RNE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
-0.001(25.0%) |
Mkt cap ! $804.1K |
Open | High | Low | Value | Volume |
0.1¢ | 0.2¢ | 0.1¢ | $69 | 63.44K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
122 | 135830427 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 8576308 | 16 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
123 | 136330427 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 8576308 | 16 |
0.003 | 9468880 | 16 |
0.004 | 2055391 | 7 |
0.005 | 1200000 | 2 |
0.006 | 3269000 | 2 |
Last trade - 12.10pm 07/10/2024 (20 minute delay) ? |
Featured News
RNE (ASX) Chart |