Energy Equity Epic Sengkang Pty. Ltd; 5 positions
Posting date: September 25, 2023 Expiry date: October 09, 2023
Energy Equity Epic Sengkang Pty. Ltd (EEES) operates the Sengkang Oil and Gas Block located in Wajo Regency, South Sulawesi. Currently EEES has 2 producing gas fields. Kampung Baru and Wasambo Farms. For the Kampung Baru Gas Field, there are 3 gas production wells each in Poleonro Village, Lamata and Macanang Districts with a Central Gas Processing Plant (CPP) with a capacity of 2×35 MMSCFD located in Kampung Baru Hamlet, Poleonro Village, Gilireng District.
Currently we are looking for the best Indonesian sons and daughters to support development activities in the management of the Sengkang Block.
1. Geologist Petrophysics
• S-1 Geoscience /Petroleum
• Have at least 5 years of work experience
• Understand petrophysical principles, including an understanding of the physical and chemical properties of rocks, as well as measurement techniques such as well logging, data processing, and interpretation of petrophysical data.
• Able to use relevant software and applications in petrophysical data analysis. This may include log processing software, reservoir modeling software, and geostatistical software.
• Have knowledge of reservoir concepts, including reservoir properties such as porosity, permeability, saturation, and reservoir pressure. Experience in identifying and characterizing reservoir zones is also required.
• Able to conduct petrophysical data analysis, identify problems, and make recommendations based on findings.
• Able to interpret petrophysical data and relate it to reservoir geology as well as understanding the quality and productivity of the reservoir zone.
• Determining logging sample collection points and perforation points during drilling activities.
2. Drilling & Subsurface Manager
• Bachelor's Degree in Petroleum
• Have a minimum of 15 years of work experience in the oil and gas industry, especially in oil and gas drilling and exploration
• Coordinate and technically evaluate geophysical and geological studies for exploration and development opportunities to align the company's business objectives.
• Direct and manage Drilling Service activities in a safe, efficient and timely manner by planning and scheduling the drilling process by paying attention to cost efficiency and optimizing all resources in order to prepare and channel high productivity hydrocarbon wells in production fields.
• Ensure and coordinate the documentation process for geophysical and geological studies which are stored properly and comprehensively in an integrated database system and maximize the advantages of information technology.
• Prepare the Department's monthly/annual work plan as a recommendation in preparing the annual work plan, to ensure suitability between workload and resources.
• Approve, monitor and evaluate costs and expenses, to ensure all costs and expenses are in accordance with the approved budget.
• Lead, control and review all aspects of project management in the drilling process to ensure that the drilling project is carried out effectively and efficiently and fully complies with QSHE policies and procedures in providing high quality hydrocarbon wells in a timely manner.
• Review, process and provide strategic information relevant to corporate/company interests to management as material for strategic decision making.
• Determine human resource needs and development activities and performance management in the Division, to ensure the quantity and quality of human resources are in line with the Company's strategy.
3. Civil Engineer
• D3 or Bachelor's Degree in Civil Engineering
• Have a minimum of 5 years work experience in preparing designs for construction.
• Have technical skills in the field of Civil Engineer and Civil Planner
• Master computer software, at least Autocad, Corel Draw, and MS Office
• Design the DSP (Drilling Site Preparation) area based on the topography results, prepare the SOW (Scope of Work) for the Drilling Site Preparation work and evaluate the topography work.
• Able to create designs, review Civil Contractor Documents, carry out experiments and data analysis
• Able to calculate material requirements and work volume according to work drawings
• Able to make cost analyzes related to the work to be carried out
4. Process Engineer
• Minimum Bachelor's Degree in Chemical Engineering / Petroleum Engineering (Petroleum)
• Minimum 5 years of experience as a Facility & Process Engineer on development projects and production operations in the oil and gas industry.
• Experienced in Process Engineering for oil and gas production facilities
• Experienced in commissioning/Startup of oil and gas production facilities.
• Experienced in FEED, HAZID and HAZOP
• Experience with SIMOP in oil and gas production activities
5. E & I Engineer
• Minimum Bachelor's Degree in Physics Engineering / Weak Current Electrical Engineering
• Minimum 5 years of experience in instrumentation, electrical and control in production operations in the oil and gas industry.
• Experienced in Engineering, Procurement, Installation, Commissioning and Startup of Oil and Gas Production facilities.
If you are what we are looking for and have the appropriate requirements - experience, you can send a job application along with complete documents to [email protected] . To know more about us, please access our website at www.energyequity.co.id.
- Forums
- ASX - By Stock
- EWC
- Moving forward
EWC
energy world corporation ltd
Add to My Watchlist
3.39%
!
6.1¢

Moving forward
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
6.1¢ |
Change
0.002(3.39%) |
Mkt cap ! $187.8M |
Open | High | Low | Value | Volume |
6.0¢ | 6.5¢ | 6.0¢ | $103.8K | 1.659M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 83285 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 167264 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 83285 | 0.061 |
2 | 214175 | 0.060 |
1 | 85153 | 0.059 |
2 | 657312 | 0.058 |
2 | 82777 | 0.057 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 167264 | 3 |
0.066 | 5000 | 1 |
0.068 | 48400 | 1 |
0.070 | 22532 | 1 |
0.072 | 50000 | 1 |
Last trade - 16.10pm 22/08/2025 (20 minute delay) ? |
Featured News
EWC (ASX) Chart |