rappier,
as you stated, linc were always going to use syngas as feedstock for a 200mw gas turbine to provide the power needs for the ctl plant. excess power was then to be sold into the market.
it would appear linc are going to accelerate the construction of the pgp and sell all of the power whilst the ctl plant is being built.
early revenue is a plus.
see the following 2 links,
http://www.coordinatorgeneral.qld.gov.au/major_projects/linc_energy.shtm
http://www.coordinatorgeneral.qld.gov.au/library/pdf/Linc_Energy_IAS.pdf
cheers
Add to My Watchlist
What is My Watchlist?