Conix, today Stuart Petroleum announced their intention to do an engineering study re the installation of a diesel plant for a cost of aprox $20M, in the Cooper Basin. HDR could possibly do a similar project in Uganda and recover a much better return on oil, should they find oil of the right grade.
HDR
hardman resources limited
mputa 1--what incremental value?, page-3
Add to My Watchlist
What is My Watchlist?