The following are all current facts which have been announced:
- Three of MRR's projects host large pegmatites. Those projects are: Tambourah North, Leavers Well and the Twin Well Project. For example, at Tambourah North Project there are large stacked pegmatites over 1.5km length by 150m in width. Then, Leavers Well is about 1.5km by 450m. Twin Well is similarly 650m.
- No drilling for Lithium has ever been carried out within the tenement areas.
- Assays are pending on 16 rock chip samples from these three projects.
- Since March 2022, planning has been underway for RC drilling over those three project areas.
Does anyone know whether the RC drilling campaign must be preceded by the assay results from the chip samples? I think everyone (including George) knows that the drilling will occur in any event given the virtual certainty of significant deposits.
MRR - Chart + FA, page-426
-
-
- There are more pages in this discussion • 223 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRR (ASX) to my watchlist
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.84M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 1.0¢ | $7.837K | 783.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 7409711 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 821793 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 7239711 | 0.009 |
13 | 13971092 | 0.008 |
10 | 4129048 | 0.007 |
3 | 2910000 | 0.006 |
3 | 1325000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 821793 | 3 |
0.011 | 5690658 | 9 |
0.012 | 4718110 | 8 |
0.013 | 3434341 | 7 |
0.014 | 500000 | 1 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
MRR (ASX) Chart |