The 2008 Work Plan at Mtonya will aim to further define and extend both surface and sub-surface mineralisation already discovered to date. The planned work includes:
• Drilling – Mtonya Corridor Q2-Q3 2008
• Drilling – Grandfather Q2-Q3 2008
• Drilling – Rufus Q2-Q3 2008
• Drilling –Moysten Q2-Q3 2008
• Drilling – Mad Fish Q2-Q3 2008
nOW THATs WORTH HANGING AROUND FOR .....CHEERS jam