Synergy Metals Ltd
Mullock dump permit
Synergy advises that Heritage Victoria has granted a 12 month 'Consent to Damage' permit (Inventory Number H 8324-0034) over the Number 5 Adit mullock dump at the Glen Wills Gold Project. The dump contains approximately 50,000 tonnes of mineralised material, earmarked for bulk metallurgical sampling and reprocessing upon the grant of a formal Works Approval by the Mines Department. This mineralised dump is one of a number of such dumps located in the immediate vicinity of the proposed mill site that will be further advanced towards reprocessing immediately upon receipt of the respective approvals.
A Work Plan covering the establishment of an Exploratory Decline designed to assist in the drill definition and bulk metallurgical sampling of underground resources has been lodged with the Mines Department.
Add to My Watchlist
What is My Watchlist?