"I don't think the 1000bopd was a steady state production figure though"
........... it takes approx 10 days to drill a well at Blue ridge. MAD have 2 rigs drilling full time there. 1 rig drilling at Boling which will probably lead to a number of wells being brought online at once when production facilitys are in place and connected. Mad are also looking to acquire another rig.
So while the production figure of 1000bopd may not have been steady at the time of writing, based on the rate of bringing new wells online I suspect it will be very shortly..
Cheers
Add to My Watchlist
What is My Watchlist?