SLX 1.70% $4.19 silex systems limited

Multi-million dollar project to change U.S. 60, I-24 exit 4 Paducah interchange begins, page-3

  1. 7,565 Posts.
    lightbulb Created with Sketch. 1289
    Project Schedule

    Future plans for the GLE project are pending. GLE has informed the NRC they are working to shut down operations, inventory materials, and prepare the materials for storage, transfer, or disposal. GEH remains committed to the safe operations of GLE. Future operations of the Test Loop, construction of a commercial laser enrichment facility, and submittal of a license application for the proposed PLEF facility are on hold.
 
watchlist Created with Sketch. Add SLX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.