“Khusib Springs was mined between 1996 and 2003 after which it closed due to the very low copper price at the time and depletion of easily minable high-grade ore. At the beginning of 2003, towards the end of mining, the copper price had fallen to US$1,500 per tonne (now nearly US$10,000 per tonne).”
10 holes results for Khusib are still pending,
8 holes results for Nosib are still pending,
new drill to test northeast of Nosib may still take time,
it will test over 100m strike > 100m depth, followed by diamond drilling.
GED does need to test more strike length: 300m*100m* 100m for 10mt+ resource
- Forums
- ASX - By Stock
- GED
- multibagger potential with soaring V2O5 price
multibagger potential with soaring V2O5 price, page-6
-
-
- There are more pages in this discussion • 137 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GED (ASX) to my watchlist
|
|||||
Last
3.3¢ |
Change
-0.002(5.71%) |
Mkt cap ! $3.812M |
Open | High | Low | Value | Volume |
3.5¢ | 3.5¢ | 3.3¢ | $5.556K | 161.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 322763 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.5¢ | 53500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 322763 | 0.033 |
3 | 113000 | 0.032 |
1 | 253980 | 0.031 |
2 | 199998 | 0.030 |
1 | 1281 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.045 | 53500 | 1 |
0.048 | 15000 | 1 |
0.049 | 80006 | 4 |
0.050 | 40000 | 1 |
0.054 | 180500 | 1 |
Last trade - 15.15pm 09/07/2024 (20 minute delay) ? |
Featured News
GED (ASX) Chart |