“Khusib Springs was mined between 1996 and 2003 after which it closed due to the very low copper price at the time and depletion of easily minable high-grade ore. At the beginning of 2003, towards the end of mining, the copper price had fallen to US$1,500 per tonne (now nearly US$10,000 per tonne).”
10 holes results for Khusib are still pending,
8 holes results for Nosib are still pending,
new drill to test northeast of Nosib may still take time,
it will test over 100m strike > 100m depth, followed by diamond drilling.
GED does need to test more strike length: 300m*100m* 100m for 10mt+ resource
- Forums
- ASX - By Stock
- multibagger potential with soaring V2O5 price
“Khusib Springs was mined between 1996 and 2003 after which it...
-
-
- There are more pages in this discussion • 137 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
Add GED (ASX) to my watchlist
|
|||||
Last
3.0¢ |
Change
-0.001(3.23%) |
Mkt cap ! $3.638M |
Open | High | Low | Value | Volume |
3.1¢ | 3.1¢ | 3.0¢ | $3.615K | 120K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 15808 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 68612 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15808 | 0.031 |
1 | 28111 | 0.030 |
1 | 200000 | 0.028 |
1 | 280080 | 0.027 |
2 | 2001 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 68612 | 1 |
0.035 | 50000 | 1 |
0.036 | 151515 | 1 |
0.037 | 147058 | 1 |
0.040 | 150000 | 1 |
Last trade - 15.08pm 02/08/2024 (20 minute delay) ? |
Featured News
GED (ASX) Chart |