AKP 0.00% $6.20 audio pixels holdings limited

Music at the AGM, page-136

  1. 1,615 Posts.
    lightbulb Created with Sketch. 271
    From the technical presentation.

    Simulation Results

    • Root cause identified to be stress in Si layers.
    • Actual stress - 400% of spec
    maximal permitted stress.
    • Process improvements
    are required but would
    take 6-18 months.
    • Membrane redesign would
    be faster and reduce sensitivity
    to stress.


    Last edited by LifeStar: 26/05/20
 
watchlist Created with Sketch. Add AKP (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.