YML unknown

my npv calculation for yml, page-5

  1. 1,201 Posts.
    lightbulb Created with Sketch. 12
    yeah, you have OTHER shares that have high NPVs due to the project life being massive etc

    these MASSIVE BIG projects tho require years to get in2 production and tonnes of drilling and defining 'indicated' resources/reserves. High levels of CAPEX are needed also.

    BUT, YML is not a massive CAPITAL INTENSIVE project and is relatively EASY to get into production. Its a simple small scale DSO hematite play!

    Thus the project IS ACHEIVABLE within 18 months id say

    the CAPEX is SMALL

    Hence the NPV of $10 per share should be looked at CLOSELY and SERIOUSLY, as we could have an operation up and going very soon as it requires little effort other than further drilling and securing either BHP or FMGs infrastructure. Financing is SIMPLE as its a small project.

    thus realistically start looking at the NPV per share of $10 using conservative price assumptions and production assumptions!
 
watchlist Created with Sketch. Add YML (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.