Yong,
Should not be a problem, UCG produces water, which can be cleaned up with RO if required. The excess H2 not required for GTL and put through the AFC fuel cell and produces deionized water, but this is likely to have a higher value than any process requirements.
The FT process in exothermic and will require some cooling. This can be done with either water or air after the steam has been used to produce electricty. If water was plentiful then a constant loss system would considered, but as it is not an evaporation system or especially if it is in a cold climate a direct air cooling system could be used if water supply was a real problem.
http://www.lincenergy.com/data/info_sheets/GTL2_explained_TPR.pdf
"Water
As in any other refining process, water
is used for plant cooling and steam
generation."
"Water
Various sections of a GTL plant
produce waste water contaminated
with organics associated with
hydrocarbons. As for any refining
operation, waste water treatment
plants would be included in a
commercial scale operation."
- Forums
- ASX - By Stock
- LNC
- my q 4 mr bond
my q 4 mr bond, page-39
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)