LOL, trouser gecko,I salute you.
From my post of the 07/02/11
To the best of my knowledge this is the chronological order in the wells drilled offshore close to Redhill Sth.
WA-286-P Cliffhead discovered =2001
TP-15 Twin lions #1 abandoned=2003
WA-286-P Vindara #1 abandoned=2003
WA-286-P Mentelle #1 indications of a 50 mtr residual oil column=2003
TP-15 Moondah #1 abandoned =2006
WA-286-P Frankland #1 discovered modest gas accumulation=2007
WA-286-P Dunsborough #1 recorded strong oil indications=2007
WA-286-P Frankland #2 appraiasal drilling disappointing abandoned=2008
WA-286-P Dunsborough #2 appraisal drilling disapointing abandoned=2008
WA-286-P Lilac #1 abandoned=2008
Are we closer to a one in eight commercial discovery because of these previous wells?.
I'll stick to my one in three chance of success, in any event.
If you deducted one each of the wells drilled Dunsbourough and Frankland from the same prospect trouser gecko,I make it eight wells drilled,will Redhill Sth be a success?
If you believe in the one -eight rule,maybe.
Raider
Add to My Watchlist
What is My Watchlist?