Hi Guys,
Lets not get facts in the way of a good story telling.
Neither the company or any poster here expects all the dug up resources (ie. 500,000 tonnes) to be DSO grade.
All the company needs is a maximum of 100,000 tonnes of DSO material - it will contain 20,000 tonnes of copper at 20%. These 20,000 tonnes will generate approx $90M (at $4,500 per tonnes of copper - a discount of approx 40% from current copper prices).
Please note the above is maximum and in most probability, the company will only sell 50,000 tonnes or less of DSO at 20% . Once the company starts shipping DSO, the shareprice will take care of itself.
Add to My Watchlist
What is My Watchlist?