27-5-2010 Golden State Resources announced that it has commenced cleaning out the Paradox Basin #3 well. A Halliburton Coil Tubing Unit (CTU) has arrived on location and has cleaned out the remnant frac fluids and sand from the 5" casing. The well is now being circulated and conditioned in preparation for further operations
if they used a coil tubing unit why is this taking so long?
- Forums
- ASX - By Stock
- my wisdom
27-5-2010 Golden State Resources announced that it has commenced...
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)