NAG 16.7% 1.0¢ nagambie resources limited

Hi NAGsters, A news release from Vic Government. Nanu Display...

  1. 1,369 Posts.
    lightbulb Created with Sketch. 252
    Hi NAGsters,

    A news release from Vic Government.

    Nanu

    Display problems? View this email in your browser.
    Search Underway For Mammoth Tunnel Boring Machines
    2nd Nov 2017

    An international search is underway for a supplier to build the four massive Tunnel Boring Machines (TBM) that will build Victoria’s biggest ever public transport project – the Metro Tunnel.

    The four TBMs needed for the $11 billion project will be more than 100 metres long, weigh up to 1,000 tonnes and be custom-built to grind through Melbourne’s unique ground conditions.

    It will take up to 18 months to build the mammoth machines before they’re tested and shipped in segments to Melbourne.

    They will then be delivered to launch sites at Arden and Domain, where they will be lowered into the ground and reassembled on-site by local workers.

    They will be in the ground, operating 24/7 in 2019.

    As they work up to 40 metres below Melbourne’s surface, they will progressively install concrete linings to support the excavated tunnel.

    Each TBM will include offices, kitchens and toilets, and be operated around the clock by a crew of around 15 people.

    As work ramps up, thousands of people flocking to the CBD in the lead-up to Christmas will be able to watch the works underway at City Square.

    Later this month windows will be installed in the giant timber fences along Swanston St to create a viewing area where people can see the former underground City Square car park demolished and removed.

    Works are underway  at City Square where construction crews will dig 11 storeys below the ground to build a new underground station.

    The Metro Tunnel project will free up space in the City Loop to run more trains, more often across Melbourne.

    The Project will create nearly 7,000 local jobs and will be completed in 2026.

    Quotes attributable to Premier Daniel Andrews

    “We’re building a world-class, turn-up and go train system for Victoria and will use the world’s best to get the job done.”

    “These giant custom-made TBMs will work day and night beneath the ground, building the Metro Tunnel to run more trains, more often, across Melbourne.”

    Quotes attributable to Minister for Public Transport Jacinta Allan

    “The new viewing area at City Square will give Victorians a behind the scenes look as major construction ramps up to build  a new underground station.”

    “The project will create thousands of jobs, and a true underground train network for Melbourne. After years of delay under the former Liberal Government – who abandoned the Metro Tunnel -- we’re getting on with it.”
 
watchlist Created with Sketch. Add NAG (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
-0.002(16.7%)
Mkt cap ! $7.966M
Open High Low Value Volume
1.0¢ 1.0¢ 1.0¢ $900 90K

Buyers (Bids)

No. Vol. Price($)
2 154067 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 371750 1
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
NAG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.