We get that we go into stage one production with 200 million shares and we all retire early as stage 2 comes online.
And we have a critical mineral renewable energy storage thematic to gladen the hearts of those NAIF folks.
If we tacked on a HZR plant to the gas and powered the whole thing with hydrogen....well we'd be a dead certaintly for bigger funding.
Hope management are finalising the NAIF deal right now. Been at it long enough.
https://naif.gov.au/wp-content/uploads/2019/10/Technology-Metals-Australia-ASX-09102019.pdf
Add to My Watchlist
What is My Watchlist?