Here's what I've come up with based on the information we've already been given.
Happy to be corrected if I've made mistakes here or unreasonable estimations.
I've never found a spec of gold in my life.
OGX EARNING CALULATIONS
Assuming our Dore sells for 75% of the price of gold
Assuming HM3 - 25t/h running 10 hours a day (250t per day)
Assuming 6 running days per week
Assuming ASIC of $1100/oz
Previous hammer mill tests from batches 1-4 gave an average gold recovery of 38g/t from samples across at least
21 different locations across the mine
No reason to expect a lower recovery rate from HM3