The overall claim is about AUD 0.5mil. About 34 pesos to the AUD. Easy to settle if it's a valid claim
Btw
If we read between the lines it tells us the natives can see money from the mining
The milling is running at about 1250oz per week or 65000oz per annum
No pit mining was planned until April
Dyor