Tui SW-2 seems to have been giving trouble down the hole just like number 1. Mind you the rig was shifted only about 30 metres to one side wasn't it ?
So they have solved that by putting in the bigger casing to a shallower depth and then running the next layer of casing down to 1500 metres.
Hmmmmmm. Hope that things proceed more smoothly from here on down to TD.
At a guess it will probably mean early June before TD is reached.
Hope that the indication of unstable shallow sediments is not an indication that things down at TD are not in the best condition either.
Fingers crossed.
Tui SW-2 seems to have been giving trouble down the hole just...
Add to My Watchlist
What is My Watchlist?