Even if you increase the crews doing the rollout, (costs are the same, rollout time is reduced)?
The rollout is not linear, the ramping up of the rollout was in progress.
2021 was realistic.
- Forums
- Political Debate
- NBN - another shattering government constructed mess and liability
NBN - another shattering government constructed mess and liability, page-89
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)