"The ways to do it are to look at the scalability of this process; I don't think it scales well; maybe a 5000 - 6000 bpd plant is feasible; but larger than that could be a headache; so in parallel with developing the first 6000 bpd plant they could look into testing various methods to improve the scalability - that could include steam/oxygen burning; greater injection rates; etc. perhaps they are planning to do this."
here's what linc are planning to do,
"On existing plans, Linc will build its commercial plant as four 5000 barrels a day modules and truck the liquids output to Brisbane for distribution by BP.
That means the logistics of construction are far more manageable for a company of Linc's size and there is no pipeline infrastructure to worry about."
cheers
LNC Price at posting:
0.0¢ Sentiment: Hold Disclosure: Held